CEMENTFLEX: TRUCKMIXER LOADING TIME DRAMATICALLY REDUCED

9 weeks
COMPETITOR SERVICE LIFE
78 weeks
CEMENTFLEX SERVICE LIFE

“We approached ConSpare to see if they could help us overcome a long standing problem. CementFlex is a clever idea which is very effective. The plant operates more reliably and truckmixer loading times have been significantly reduced. It’s much easier to clean too.” Area Maintenance Engineer

The Challenge:

Rubber cement socks on the drybatch leg of a readymixed concrete plant were suffering regular blockage and premature failure. Aggregate discharge was causing the cement sock to compress, leading to flow restriction, increased truck loading time, uneven cement distribution and caused the sock to rip.

Our Solution:

CementFlex molded Hawiflex polyurethane tube

The Improvement:

Blockage eliminated and more consistent cement flow into truck

Competitor sock: 9 weeks
CementFlex: 78 weeks

PROJECT DETAILS

Key features:

  • Retains tubular shape to prevent blockages

 

Benefits

Efficiency – reduce truckmixer loading time significantly

Long Life – extremely abrasion resistant

Mix Quality – cement and aggregate feed simultaneously

Easy Cleaning – minimise blockages

Environmental – significantly reduced dust emission