Happy Holidays from the team at ConSpare!

We are closed now until the 2nd of January 2025 but we’d like to thank all of you for your ongoing support each year. Have a Merry Christmas and a Happy New Year, see you all soon!

Contact us

MATROX IMPROVES CONCRETE PLANT PERFORMANCE

"Brilliant"
NO BUILD UP, NO BLOCKAGE

“Matrox is absolutely brilliant. We now have no build up or material sticking whatsoever and the limestone flows freely. Concrete quality has improved dramatically as consistent flow rates mean our computer batching system and moisture probes operate more accurately. We don’t have to get into the bin to clean it out so safety has also improved.” Regional Operations Manager

The Challenge:

A readymix concrete plant handling crushed limestone dust was experiencing severe blockage in storage bins. The fine, powdery dust was sticking to bin walls and forming a hard crust, particularly when wet. Layers of build-up developed over time, reducing bin capacity and causing severe rat-holing. Attempts to solve the problem with air hammers compacted the dust making matters worse.

Our Solution:

Matrox premium grade UHMW polyethylene – 2m x 1m sheets

The Improvement:

Limestone flows freely, no build up, no blockage

PROJECT DETAILS

Key Features

  • Lowest surface friction
  • Special additives enhance performance, UV resistant

Benefits

Product quality – consistent, top quality concrete

Batching – fast, reliable material flow through bins

Accuracy – Hydronix moisture probes more effective

Safety – ‘self cleaning’ bin walls, no need to enter bin

Customer satisfaction – plant reliability improved

Environmental – helps prevent reject loads, less waste

 

RELATED CASE STUDIES

Send us an enquiry