Teka TPZ Planetary mixer achieves environmental and financial savings for major roof tile producer
Teka TPZ replaces rotating pan mixer, saving 68,000kWh of power per year.
£40,800
Annual-Saving
23.8t
Annual CO2 Saving
43%
Return-on-investment

“The Walter service scheme is great. We have the system serviced yearly and it is completely hassle free, ConSpare organise everything. The engineers are very knowledgeable and really know how to get the best out of the kit. I have had my system for 5 years, and I think it works better now than it did when it was first installed!” Plant Manager
A leading concrete producer decided to install a mixer cleaning system at a high profile plant.
Management were concerned that other systems had operated successfully initially, but suffered declining performance over time. Walter Washout was chosen as ConSpare offer a full maintenance scheme to help maintain optimum performance.
Walter Approved Service Scheme
Optimum cleaning performance and reliability maintained
Key features:
Benefits:
Safe – high pressure equipment requires professional inspection
Trained – service engineers trained by Walter
Quality – only original Walter spares used
Tooling – unique Walter tooling essential to carry out service
Comprehensive – full inspection, testing and operator refresher training
No Surprises – charges agreed before work carried out