Hillhead 2026 – ConSpare will be there!
Join us on stand F6 at Hillhead 2026 for the latest in concrete production & batch plant technology.
Read ArticleIn our latest case study, a maintenance supervisor for a leading manufacturer producing concrete blocks wanted to reduce the amount of maintenance carried out on their planetary mixer. The wear life achieved from the standard OEM grade floor plates was around two years before replacement plates were required. By installing AlphaPlate hardweld coated mixer wear plates, their wear plate service life has increased to 10 years.

Click here to read the full case study and find out how we achieved this.
Join us on stand F6 at Hillhead 2026 for the latest in concrete production & batch plant technology.
Read Article
It was great to visit Centrum Pile Ltd recently to see their newly commissioned TEKA pan mixer. The new TEKA THZ3000A (2m³) machine replaces an ageing 1.5m³ pan mixer.
Read Article